Concrete Calculator

Cubic yards, bags, and honest cost comparison — for slabs, footings, circles, and sonotubes.

Order 5–10% extra. Forms bulge, subgrades are never perfectly level, and coming up short mid-pour is the most expensive mistake in concrete. Tick the waste box below — it adds a 5% cushion.

How much concrete do you need?

4″ is the standard minimum for a residential slab; driveways usually 5–6″.

Formula used: volume = L × W × depth (rect) or π × (d/2)² × depth (round), ÷ 27 for cubic yards. Bags = ceiling(volume ÷ bag yield). Ready-mix usually wins above ~1–2 yards.

Worked examples: three jobs, three different answers

A 10 ft by 10 ft patio slab at 4 inches is 33.3 cubic feet, or 1.23 cubic yards before waste. With the 5 percent cushion that is about 1.30 yards. In 80-lb bags at roughly 0.6 cubic feet each, that is about 58 bags, near $319 at $5.50 per bag. A ready-mix truck at $150 per yard is about $195 for the same volume, plus any short-load fee. This is exactly the crossover zone: bags are possible in a long morning, ready-mix is cheaper and finished in an hour.

A 20 ft by 24 ft garage slab at 4 inches is 5.93 cubic yards, about 6.22 yards with the cushion, or roughly 467 bags. Nobody should mix 467 bags. At this size the question is not bags versus truck, it is scheduling, pump or buggy access, and whether your forms and help are ready when the truck arrives.

Four sonotube piers, 12 inches across and 3 ft deep, need about 0.35 cubic yards in total, roughly 26 bags of 80-lb mix. That is a bag job: small, spread across four holes, and easy to mix one tube at a time without racing a truck clock.

How thick should it be?

Sidewalk, patio, shed floor (foot traffic only)4 inches, the residential minimum
Driveway for cars and light trucks5 to 6 inches, with reinforcement and a compacted base
Garage floor4 to 6 inches depending on vehicle weight and soil
FootingsDepth set by your local frost line, width by load and code
Sonotube piersBelow the frost line, diameter matched to the post and load

Thickness is not a place to save money by going thin. A slab that is an inch too thin cracks under loads it was meant to carry, and there is no cheap repair that restores its strength. If the budget is tight, make the slab smaller, not thinner.

The base matters as much as the volume

Concrete poured over soft, uncompacted soil settles unevenly and cracks even when the yardage math was perfect. Strip sod and loose topsoil, compact the subgrade, and add 2 to 4 inches of compacted gravel where drainage or frost is a concern. Check the full sequence in the slab prep checklist before delivery day. Also confirm slope: exterior slabs should fall about 1/8 to 1/4 inch per foot away from buildings so water does not pool against a foundation.

Common ordering mistakes

Ordering exactly the calculated volume is the first mistake; forms bulge and low spots eat the difference, which is why the calculator adds a cushion. The second is forgetting that ready-mix is sold in whole or partial truck increments with minimums and short-load fees, so a 1.3-yard pour may be billed very differently from the per-yard rate. The third is mixing bag counts between 60-lb and 80-lb bags mid-job. Pick one size, use its yield, and buy a few spare bags you can return unopened.

Content reviewed October 2026. Local codes set footing depth and reinforcement requirements; this calculator gives volume and cost estimates only.

Guides

FAQ

How many 80-lb bags of concrete are in a cubic yard?
About 45. Each 80-lb bag yields roughly 0.6 cubic feet, and a cubic yard is 27 cubic feet. For 60-lb bags (about 0.45 cu ft each), plan on about 60 per yard.
Should I order extra concrete?
Yes — 5–10% beyond the math. Forms flex outward, subgrades dip, and the cost of a second delivery or a cold joint dwarfs the price of a few spare bags.
When does ready-mix delivery beat bags?
Usually above 1–2 cubic yards. Mixing 90 bags by hand is a brutal day; a truck shows up and it's done in an hour. Compare both costs in the calculator above.